SCRIPPS GREEN HOSPITAL - LA JOLLA

Client

Henrick Construction

Scripps Green Hospital 

Project Lead

Mary Ann McBee, Playground Specialist 

Project Overview

This project involves the professional installation of poured-in-place (PIP) surfacing, ensuring compliance with all manufacturer specifications and safety standards.

Scope of Work

Remove and Dispose Existing Track and Base

  • Remove Existing Track Surface: Approx. 7700 Square Feet 
  • Remove 4″ of existing base: Approx. 90-95 Cubic Yards

Install Class 2 Base for New Track Surface

  • Provide and Install 4″ of Class 2 Base for new track surface: Approx. 140 Tons
  • Class 2 Base to be compacted to 90-95% Compaction Rate

Install Concrete Mow Curb

  • Provide and Install Concrete Mow Curb 6″ x 6″
  • Curb to be used as border for new base and PIP for track 
  • Curbing to be on outside and inside perimeter track

Poured-in-Place (PIP) Rubber Surfacing

  • Area: 7,700 square feet of 1 1/2″ PIP installed
  • Colors and Designs:
    • Color #1: 50% Black and 50% Bright Red with aromatic binder

The PIP surfacing will be installed as per plans, incorporating the specified colors and designs for aesthetic appeal and safety.

Paint Track Stripes

  • Provide and Install Track Striping for lanes
  • Track to be 3-4′ lanes 